6 steps to do before you build a house in the Philippines.

We put this checklist together for every family building a home on their own. It is free, ready to print, and yours to use at every step.

By Jaella Magno, Head of Editorial & Research Watch the report on YouTube
Download PDF
Step 1

Soil test the land.

Before you buy the lot, if you can. If you already own it, do it now.

Red flagThe seller refuses to let you do a soil test. Walk away. A serious seller wants a serious buyer, and a serious buyer does soil tests.
What skipping it costs500 thousand to 2 million pesos in extra foundation work. Sometimes the soil is so bad you cannot build the house you wanted at all.
Step 2

Set your real budget.

Almost every homeowner budgets for the construction cost only. They hear 35,000 pesos per square meter, plan a 200 square meter house, and think the budget is 7 million. Wrong by roughly 3 to 4 million.

Example computation on a 7 million peso build
ConstructionP7,000,000
Design team (10 to 15%)P700,000 to P1,050,000
Permits, clearances, utility connections (1 to 3%)P70,000 to P210,000
Finishes and furniture (10 to 15%)P700,000 to P1,050,000
Buffer (15 to 30%)P1,050,000 to P2,100,000
Real totalP9.5 to P11.4 million
RuleBudget for the total. Not just the build.
Step 3

Hire your architect first.

Architect muna, o contractor? Always the architect. The architect designs your house. The contractor builds what the architect designed. Without the architect, the contractor builds whatever is cheapest for him.

Red flagA fee far below the range, or free plans if you hire the architect's contractor. Cheap architects cut corners. You pay for it later.
Step 4

Understand your building permit.

The part everyone hates, and the part that gets the most homeowners scammed. A building permit is not one document. It is a package of clearances and signed plans.

The usual package:
Red flagAnyone promising a permit in two weeks for a full residential build. They are lying about the timeline, lying about the permit, or skipping it entirely.
Step 5

Shortlist three contractors.

Your architect will probably offer to introduce you to their preferred contractor. It feels helpful. Do not take it. The architect and the contractor on your build should have no connection to each other. Two independent professionals check each other. Two friends cover for each other.

Red flagNo PCAB license, or refuses to give five references. That is your answer.
The family contractor trapNo contract because it feels awkward. No comparison quotes because it feels like distrust. Then the project goes wrong, and you cannot fire him without destroying the relationship.
Step 6

Sign a contract, not a quote.

The step most homeowners get wrong. A quote protects the contractor. A contract protects you. Never sign a one-page quote.

A proper construction contract runs 20 to 40 pages and has all nine:
Red flagThe contractor refuses to sign a contract like that. He is telling you exactly who he is. Walk away quietly and go to the next one on your shortlist.

Already two months in and skipped some of these?

Our recommendation is to pause, go back, and work through all six steps in order. It may cost you thirty days or more. In our experience, the families who skipped these steps have lost millions of pesos and years of peace of mind. A month now is the better trade.

Stop building on trust. Start building on proof.